Elixir Audits, Chartered Accountants

Most failed accounting system implementations we are asked to rescue failed for the same reason: the chart of accounts was accepted as it came out of the box. Everything downstream then fights it, and within a year the reports are being rebuilt in Excel anyway.

Start with the reporting

We begin with what you need to see monthly: by line, by contract, by location, by whatever actually drives decisions in your business. The chart of accounts, tracking categories and reporting structure are then designed backwards from that. It takes a day longer and saves a year.

What implementation covers

Opening balances migrated and agreed, bank feeds connected, approval workflows configured so that one person cannot initiate and pay, multi-currency where you deal in more than cedis, and the fixed asset register set up rather than left to a spreadsheet.

Training, and why it is in the fee

An implementation that leaves you dependent on the implementer has not finished. Training your team is part of the engagement, not an extra, and we hand over documentation for the specific way your file has been set up rather than pointing you at generic help articles.

3 to 6 weeks

From kick-off to running live

Reporting first

The chart of accounts is designed backwards from it

Trained

Your team owns the file afterwards

Scope

What implementation covers

Scoped to your business rather than to a standard package, because the setup is where the value is.

01

Requirements and chart of accounts

What you need to see monthly, and a chart of accounts and tracking structure designed to produce it. This is the step that determines whether the system works.

02

Migration and opening balances

Data from spreadsheets or a legacy system, with opening balances agreed to the last set of accounts rather than assumed.

03

Configuration

Bank feeds, approval workflows, user permissions with proper segregation, multi-currency, and the fixed asset register.

04

Training and documentation

Sessions for the people who will use it, and written documentation of how your specific file is set up.

Process

How an implementation runs

Short, and it ends with your team running a live month rather than with a handover email.

Do not migrate mid-year without a planOpening balances have to agree to something. Mid-year migrations are entirely possible but the cut-over needs designing, and doing it badly creates an audit problem next year.

Requirements

What you report on, who needs to see it, and what the current system fails to produce.

Week 1

Design

Chart of accounts, tracking categories, permissions and workflows, agreed with you before anything is built.

Week 1 to 2

Build and migration

Configuration, data migration and opening balances agreed to your last accounts.

Weeks 2 to 4

Parallel or cut-over

Depending on timing, either a parallel month or a clean cut-over at a period end.

Weeks 4 to 5

Training and handover

Sessions for each user group, plus documentation of your specific setup.

Week 5 to 6

Engagement

Fees, timing and who does the work

Fee basis

Fixed implementation feeSet on the number of users, the migration scope and whether multi-currency is required. Licences are billed by Xero, not by us.

Who does the work

A manager and an implementation leadWith a partner on the chart of accounts design, because that decision outlives everything else.

Timeline

Three to six weeksLonger where migration data is poor or multiple entities are involved.

Indicative only. Every fee is quoted in the proposal, before any work starts, and held unless the scope changes.

Questions

Questions on implementation

Do we have to use Xero?
No. We work with QuickBooks and Sage too. Xero suits most businesses at this size for its bank feeds and approval workflows, but if you are already on something that works we would rather improve it than move you.
Can you migrate mid-year?
Yes, but the cut-over needs designing. Opening balances have to agree to something, and a badly executed mid-year migration creates an audit problem the following year. We plan it properly or recommend waiting for a period end.
Will you run the bookkeeping afterwards?
Only if you want us to. Many clients implement with us and then run it themselves, which is a perfectly good outcome and the reason training is in the fee rather than sold separately.
What about multi-currency?
Configured where you need it, with the revaluation policy agreed at setup rather than discovered at year end. Businesses dealing in dollars alongside cedis should raise this at the requirements stage.
How much of our team's time does this take?
A day at requirements, a half-day reviewing the design, and a day of training per user group. Migration and configuration are ours. Clients who engage properly at the requirements stage get a system that fits.

Next step

Tell us what you cannot see today.

The report you need and cannot produce is usually the fastest route to a chart of accounts that actually works.

Request an implementation quote Speak to a partner

Contact

+233 53 362 2433 info@elixiraudits.com

1 Alex Nkrumah Street, Airport West, Accra